As we're continuing to innovate and build taller timber buildings, the installation process is sometimes an afterthought. With good planning, the installation can be de-risked and improve the overall program. In this episode, we're speaking with Lincoln Ladds who is an Associate Engineer at TTW about:
- The challenges around mixing materials on a project
- The temporary works design considerations
- And major lessons learned in construction engineering for the projects he's been part of